Construction Cost Estimating for Florida Contractors & Remodelers
Plan review, quantity takeoffs and detailed cost estimates for general contractors and remodelers across Florida, built from your drawings, line by line.
Residential & commercial · Florida-wide
Animated floor plan of a 1,248 square foot residential remodel being measured room by room.
Takeoff
- 1,248
- SF floor
- 186
- LF partitions
- 8
- EA doors
The problem
Bidding eats your week.
Every set of plans means hours of measuring, counting and pricing, time you're not spending on site, with clients, or winning the next job. And when a takeoff gets rushed, a missed line item becomes your margin.
The solution
From plans to a number you can stand behind.
Nothing missed
Every sheet reviewed and every scope item counted, with a takeoff you can audit.
Built for bidding
Costs grouped by trade and division, so you can compare against sub quotes and adjust fast.
Capacity on demand
Extra estimating horsepower when your bid calendar fills up, without adding payroll.
From plan to estimate
Every line, counted and priced
Scroll to follow the plan into a bill of quantities. Each row lights up the area it measures.
| Item | Qty | Unit | Unit cost | Total |
|---|---|---|---|---|
| Selective demo & floor prep | 1,248 | SF | $6.00 | $7,488 |
| Interior partitions, metal stud | 186 | LF | $18.00 | $3,348 |
| Drywall 5/8" type X, both sides | 3,100 | SF | $2.50 | $7,750 |
| Interior doors, hollow core | 8 | EA | $420 | $3,360 |
| LVP flooring | 1,090 | SF | $5.50 | $5,995 |
| Interior paint, 2 coats | 4,200 | SF | $1.20 | $5,040 |
| Direct cost subtotal | $32,981 | |||
Illustrative sample, not a quote.
From plan to estimate
Every line, counted and priced
Follow the plan into a bill of quantities. Each step highlights the area it measures.
Step 01
Selective demo & floor prep
- Qty
- 1,248 SF
- Unit cost
- $6.00
- Total
- $7,488
Step 02
Interior partitions, metal stud
- Qty
- 186 LF
- Unit cost
- $18.00
- Total
- $3,348
Step 03
Drywall 5/8" type X, both sides
- Qty
- 3,100 SF
- Unit cost
- $2.50
- Total
- $7,750
Step 04
Interior doors, hollow core
- Qty
- 8 EA
- Unit cost
- $420
- Total
- $3,360
Step 05
LVP flooring
- Qty
- 1,090 SF
- Unit cost
- $5.50
- Total
- $5,995
Step 06
Interior paint, 2 coats
- Qty
- 4,200 SF
- Unit cost
- $1.20
- Total
- $5,040
Direct cost subtotal
$32,981
Illustrative sample, not a quote.
Services
What we take off your desk
-
Plan Review & Scope Check
We read the full set and flag gaps, conflicts and missing scope before they reach your bid.
-
Quantity Takeoffs
Counts, lengths and areas measured by sheet and organized so you can audit every number.
-
Detailed Cost Estimates
Line-by-line pricing built from your takeoff and grouped by trade and division.
-
Bid Package Support
Scope sheets, inclusions and clarifications organized so your package goes out complete.
-
Remodel & Renovation Estimating
Demolition, existing conditions and phased scopes priced with the detail remodels demand.
How it works
Five steps, from drawings to estimate
Send your project
Share your drawings, specs and scope notes through the form below.
We review the set
We go through every sheet and note gaps, conflicts and missing scope.
We take off quantities
Quantities are measured and counted by sheet and by trade.
We price it
Unit costs are applied and organized by division, with assumptions stated.
You receive the estimate
You get the itemized estimate, the takeoff backup and a list of clarifications.
Tools
Built on the tools estimators trust.
On-Screen TakeoffAutoCADRevitCivil 3DExcel
Estimating led by a civil engineer with 9+ years in commercial and residential construction.
What you receive
- 01Itemized estimate (Excel + PDF)
- 02Takeoff backup with quantities by sheet
- 03Assumptions, inclusions and exclusions
- 04Questions & clarifications list
Optional add-on Project schedule built in Microsoft Project, available on request.

About
Who you'll work with
I’m a civil engineer with nine years of construction experience across four countries.
For the past two years, I’ve prepared quantity takeoffs and cost estimates for U.S. contractors.
I help you submit clear, professional proposals on time, backed by detailed quantity takeoffs and itemized pricing.
FAQ
Good questions
What do I need to send?
Plans (PDF or CAD), specs if available, scope notes and your bid due date.
What kinds of projects?
Residential and commercial remodels, renovations and new construction.
Can you help with just the takeoff?
Yes. Takeoff only, or a full priced estimate.
How long does an estimate take?
It depends on the size of the plan set and the scope. Put your bid due date in the form and we'll confirm a delivery date before we start, so you know it fits your deadline.
How much does it cost?
We charge per project, not by the hour. Every project is quoted after we see the plans and the scope you need, whether that's takeoff only or a full priced estimate. Send your project and we'll reply with a flat quote and delivery date before any work begins.

Request an Estimate
Send us your plans.
Tell us about the project and upload your drawings. We'll take it from there.
Thank you. Your request is in.
We'll review your project and reply by email with the details.