Empty drafting table seen from above, with a wooden triangular scale and a mechanical pencil

Construction Cost Estimating for Florida Contractors & Remodelers

Plan review, quantity takeoffs and detailed cost estimates for general contractors and remodelers across Florida, built from your drawings, line by line.

Residential & commercial · Florida-wide

Animated floor plan of a 1,248 square foot residential remodel being measured room by room.

Takeoff

1,248
SF floor
186
LF partitions
8
EA doors

The problem

Bidding eats your week.

Every set of plans means hours of measuring, counting and pricing, time you're not spending on site, with clients, or winning the next job. And when a takeoff gets rushed, a missed line item becomes your margin.

The solution

From plans to a number you can stand behind.

01

Nothing missed

Every sheet reviewed and every scope item counted, with a takeoff you can audit.

02

Built for bidding

Costs grouped by trade and division, so you can compare against sub quotes and adjust fast.

03

Capacity on demand

Extra estimating horsepower when your bid calendar fills up, without adding payroll.

From plan to estimate

Every line, counted and priced

Scroll to follow the plan into a bill of quantities. Each row lights up the area it measures.

Bill of quantities
ItemQtyUnitUnit costTotal
Selective demo & floor prep1,248SF$6.00$7,488
Interior partitions, metal stud186LF$18.00$3,348
Drywall 5/8" type X, both sides3,100SF$2.50$7,750
Interior doors, hollow core8EA$420$3,360
LVP flooring1,090SF$5.50$5,995
Interior paint, 2 coats4,200SF$1.20$5,040
Direct cost subtotal$32,981

Illustrative sample, not a quote.

From plan to estimate

Every line, counted and priced

Follow the plan into a bill of quantities. Each step highlights the area it measures.

  1. Step 01

    Selective demo & floor prep

    Qty
    1,248 SF
    Unit cost
    $6.00
    Total
    $7,488
  2. Step 02

    Interior partitions, metal stud

    Qty
    186 LF
    Unit cost
    $18.00
    Total
    $3,348
  3. Step 03

    Drywall 5/8" type X, both sides

    Qty
    3,100 SF
    Unit cost
    $2.50
    Total
    $7,750
  4. Step 04

    Interior doors, hollow core

    Qty
    8 EA
    Unit cost
    $420
    Total
    $3,360
  5. Step 05

    LVP flooring

    Qty
    1,090 SF
    Unit cost
    $5.50
    Total
    $5,995
  6. Step 06

    Interior paint, 2 coats

    Qty
    4,200 SF
    Unit cost
    $1.20
    Total
    $5,040
  7. Direct cost subtotal

    $32,981

Illustrative sample, not a quote.

Services

What we take off your desk

  • Plan Review & Scope Check

    We read the full set and flag gaps, conflicts and missing scope before they reach your bid.

  • Quantity Takeoffs

    Counts, lengths and areas measured by sheet and organized so you can audit every number.

  • Detailed Cost Estimates

    Line-by-line pricing built from your takeoff and grouped by trade and division.

  • Bid Package Support

    Scope sheets, inclusions and clarifications organized so your package goes out complete.

  • Remodel & Renovation Estimating

    Demolition, existing conditions and phased scopes priced with the detail remodels demand.

How it works

Five steps, from drawings to estimate

  1. Send your project

    Share your drawings, specs and scope notes through the form below.

  2. We review the set

    We go through every sheet and note gaps, conflicts and missing scope.

  3. We take off quantities

    Quantities are measured and counted by sheet and by trade.

  4. We price it

    Unit costs are applied and organized by division, with assumptions stated.

  5. You receive the estimate

    You get the itemized estimate, the takeoff backup and a list of clarifications.

Tools

Built on the tools estimators trust.

On-Screen TakeoffAutoCADRevitCivil 3DExcel

Estimating led by a civil engineer with 9+ years in commercial and residential construction.

What you receive

  • 01Itemized estimate (Excel + PDF)
  • 02Takeoff backup with quantities by sheet
  • 03Assumptions, inclusions and exclusions
  • 04Questions & clarifications list

Optional add-on Project schedule built in Microsoft Project, available on request.

Portrait of Yinesca Duarte, civil engineer and estimator, smiling in a black blazer
Yinesca Duarte · Civil Engineer

About

Who you'll work with

I’m a civil engineer with nine years of construction experience across four countries.

For the past two years, I’ve prepared quantity takeoffs and cost estimates for U.S. contractors.

I help you submit clear, professional proposals on time, backed by detailed quantity takeoffs and itemized pricing.

FAQ

Good questions

What do I need to send?

Plans (PDF or CAD), specs if available, scope notes and your bid due date.

What kinds of projects?

Residential and commercial remodels, renovations and new construction.

Can you help with just the takeoff?

Yes. Takeoff only, or a full priced estimate.

How long does an estimate take?

It depends on the size of the plan set and the scope. Put your bid due date in the form and we'll confirm a delivery date before we start, so you know it fits your deadline.

How much does it cost?

We charge per project, not by the hour. Every project is quoted after we see the plans and the scope you need, whether that's takeoff only or a full priced estimate. Send your project and we'll reply with a flat quote and delivery date before any work begins.

Request an Estimate

Send us your plans.

Tell us about the project and upload your drawings. We'll take it from there.

PDF, DWG, DXF, ZIP, JPG or PNG. You can select several files.

    Your files are used only to prepare your estimate.